Rentech Water-tube Package Boiler
Built 2012
55,250 PPH
725 PSI Design
780 F Design
Computerized controls and burner management systems
Cohen burner for Natural gas, Biogas, and Syngas, both separately and in combinations.
ID and FD fans
Economizer
Baghouse was part of a sodium bicarbonate injection system for sulfur control when burning syngas with high levels of sulfur. It is in poor condition due to bicarb residues
Stack
No feedwater, condensate or de-aerator systems (sold with turbine)
Boiler was in service at a pilot plant as a turbine driver (7.5MW, already sold) and for process steam delivery at 610psi and 700F.
It ran intermittently for three years, and then was laid up dry with N2 on the water side and electric heaters in the firebox until 11/2019. The tubes are in good condition and the overall condition is very good. The tri-gas burner would be a benefit if landfill gas or equivalent was nearby.
Price: $118,000 (USD) where-is and as-is, no warranty
Loading quotes by request. FOB Florida.